Schedule line / scheduling - BPX

In the sales documents data are set on three levels: the header, item and schedule line. Schedule line level is the most detailed, providing information on the product is available on specific dates . The date on which the system will confirm us by controlling the availability of goods is determined by scheduling forward or backward.